Last updated: November 2, 2026
The best Smartsheet alternatives for construction are ProjectManager, Procore, Fieldwire, Contractor Foreman, Microsoft Planner and Project, and Primavera P6. ProjectManager is the best fit for general contractors and subcontractors who use Smartsheet mainly for schedules and trackers, because it adds critical path scheduling and crew workload across jobs without building everything from sheets, while Procore suits teams whose main need is RFIs, submittals and drawings, Fieldwire suits field teams working from plans, Contractor Foreman suits budget-conscious contractors who want an all-in-one tool, Microsoft Planner and Project suits teams on Microsoft 365, and Primavera P6 suits professional schedulers on very large or owner-mandated programs.
Smartsheet is a common starting point for construction teams. It’s flexible, it looks like the spreadsheets everyone already knows, and it can be set up for schedules, punch lists, RFI logs and safety reporting. The trade-off is that every construction workflow has to be built from sheets, forms and templates, and some of what construction teams need most, such as resource planning across jobs, comes as a paid add-on.
This guide explains how construction teams use Smartsheet, why they look for alternatives and how six tools compare on critical path scheduling, crew visibility, field access, construction documents and price. For alternatives outside construction, see the best Smartsheet alternatives.
ProjectManager is online project management software for construction scheduling. Import your Smartsheet schedule from Excel, link tasks with all four dependency types, filter for the critical path and see every crew’s workload across all your jobs. Get started with ProjectManager today for free.
How Construction Teams Use Smartsheet
Construction teams use Smartsheet to build schedules, track RFIs and punch lists, collect field data with forms and report progress on dashboards. Smartsheet markets solutions for pre-construction, punch lists, field safety, RFI tracking, capital construction and quality control, all built on its core platform, and it offers construction templates for submittals, RFI logs and budgets.
Smartsheet does several things well for construction. Its Gantt charts support all four dependency types with lag and highlight the critical path, the spreadsheet layout needs little training, and free contributors mean subcontractors can view and comment on shared sheets without a paid seat. Mobile forms, including QR-code safety reporting, help superintendents get information back from the field quickly. For a closer look, see Smartsheet for general contractors.
Why Construction Teams Look for Smartsheet Alternatives
Construction teams look for Smartsheet alternatives when they outgrow building everything from sheets, need to see crews across jobs or need the schedule to work better in the field. These are the main reasons:
- Everything has to be built. RFIs, submittals and punch lists are sheets, forms and templates rather than dedicated construction tools, so someone has to set them up and maintain them. Smartsheet has no drawing version control.
- Crew visibility across jobs costs extra. The Business plan includes workload tracking within sheets, but full resource planning and time tracking come from Resource Management by Smartsheet, a paid add-on. When the same framing crew is booked on three job sites next week, that’s the view a GC needs.
- The Gantt chart stays in the office. On the Smartsheet mobile app, sheets open in grid, card and list views, and the Gantt view is available for reports only. Only forms work offline, so a superintendent on a site with poor signal can’t update the schedule.
- Scheduling depends on discipline. Reviewers on G2 and Capterra mention a learning curve, and schedules only stay accurate if everyone uses dependencies instead of typing dates. When framing slips, drywall and inspections only move if the links are in place.
- Large sheets slow down. Reviewers also mention slower performance on large or heavily shared sheets, which matters on long commercial schedules.
If your team mainly needs flexible trackers and forms, Smartsheet may still be enough. If you need scheduling, crew planning or construction documents that work out of the box, the alternatives below are worth comparing.
What to Look for in a Smartsheet Alternative for Construction
A good Smartsheet alternative for construction keeps the schedule logic you rely on and adds what Smartsheet leaves to add-ons or custom setup. Check for these features:
- Critical path and all four dependency types with lag. The tool should calculate the critical path from finish-to-start, start-to-start, finish-to-finish and start-to-finish links, with lag for cure times, inspection holds and material lead times.
- Baselines. Save the original plan and compare it with actual progress, to run the job and to document delays.
- Crew and resource visibility across jobs. See each crew’s and subcontractor’s hours across every project, not one sheet at a time.
- Field and mobile access. Superintendents and foremen should be able to view the schedule and update progress from a phone or tablet.
- Construction documents. Decide whether you need dedicated RFI, submittal and drawing tools, or whether file storage and task attachments are enough.
- Excel import from Smartsheet. Smartsheet exports sheets to Excel, so check how the new tool imports Excel and whether you’ll need to re-link dependencies.
- Predictable pricing. Compare per-user pricing with volume-based pricing, and count supers, foremen and subs who need access.
Smartsheet Alternatives for Construction Compared
| Tool | Best for | Critical path | Resource view across jobs | Field/mobile access | Construction documents | Starting price |
|---|---|---|---|---|---|---|
| ProjectManager | GCs and subs who use Smartsheet mainly for schedules and trackers | Yes, critical path filter with all four dependency types and lag | Workload page across all projects (Business) | Browser on any OS, iOS and Android apps | File attachments and project files; no RFI, submittal or drawing tools | $15/user/month (Team), $28/user/month (Business), billed annually |
| Procore | GCs whose main need is RFIs, submittals and drawings | Yes, in Procore Scheduling | Team members assigned to schedule activities | iOS and Android apps; Procore’s user guide lists Scheduling actions as web-only | RFIs, submittals and drawings | Quote only, based on annual construction volume |
| Fieldwire | Field teams working from plans, tasks and punch lists | No; Gantt view of tasks, not a CPM scheduler | Task assignments by project | iPhone, iPad and Android apps | Plan viewing on all plans; RFIs and submittals (Business Plus) | Free plan; Pro $39/user/month, billed annually |
| Contractor Foreman | Budget-conscious contractors who want an all-in-one tool | Listed on its product page; Gantt with all four dependency types, lag and baselines | Crew schedule (Plus and above) | iPhone, iPad and Android apps | Submittals (Pro and above), change orders (Plus and above) | $49/month for the company (Basic, billed annually); Gantt scheduling from $166/month (Plus) |
| Microsoft Planner and Project | Construction teams on Microsoft 365 | Yes, in Planner and Project Plan 3 and Project desktop | People and assignments views in premium plans | Planner in a browser and on mobile; Project desktop on Windows | None built in | Planner Plan 1 $10/user/month, paid yearly |
| Primavera P6 | Professional schedulers on very large or owner-mandated programs | Yes, by total float or longest path | Detailed resource loading across enterprise projects | P6 EPPM in a browser; mobile apps for updating assigned activities | Scheduling only | Quote only |
Prices are list prices as of November 2026 and change often. Check each vendor’s site before buying.
6 Best Smartsheet Alternatives for Construction
1. ProjectManager
ProjectManager is the best Smartsheet alternative for most construction teams that use Smartsheet mainly for schedules and trackers. Its sheet view keeps the rows and columns Smartsheet users know, and the Gantt chart links the same tasks with all four dependency types and lag, so when framing slips two days, drywall, the rough-in inspection and the finish date move with it. A critical path filter shows which tasks drive the finish date, and baselines and variance reports show how far the job has drifted.
ProjectManager also covers the view Smartsheet sells as an add-on: crews across several job sites. The workload page shows each person’s hours across all projects, equipment and subcontractors can be added as resources without buying them a license, and timesheets record actual hours. Supers and foremen update progress from the iOS and Android apps. For a feature-by-feature comparison, see Smartsheet vs. ProjectManager.
Best for: General contractors and subcontractors who use Smartsheet mainly for schedules and trackers and need critical path scheduling and crew workload across several jobs.
Key features
- Sheet, Gantt, Kanban board, list and calendar views
- Gantt charts with finish-to-start, start-to-start, finish-to-finish and start-to-finish dependencies, plus lag
- Critical path filter, baselines and variance reports
- Workload page showing hours across all projects (Business plan and above)
- Equipment and subcontractors as resources with no license cost
- Timesheets, dashboards and portfolio views
- Import of Excel, CSV, MPP and Microsoft Project XML files, and export to Excel, CSV, MPP and XML
Pros
- Critical path, baselines and crew workload without add-ons or custom setup
- Familiar sheet view for teams coming from Smartsheet
- 30-day free trial
Cons
- No RFI, submittal or drawing management, so teams that need those keep a document tool alongside it
- The sheet view isn’t a spreadsheet, so Smartsheet formulas don’t carry over
- The workload page needs the Business plan, and the Team plan is limited to 20 projects
Pricing: Team $15/user/month, Business $28/user/month (billed annually), Enterprise by quote. 30-day free trial.
2. Procore
Procore is the better fit for construction teams whose main need is documents rather than scheduling. It includes dedicated tools for RFIs, submittals and drawings, along with budgets, quality and safety, so the workflows Smartsheet teams build from templates come ready to use. Procore Scheduling, generally available since February 2026, adds schedules with dependencies, the critical path and lookaheads.
For teams leaving Smartsheet mainly over scheduling, there are trade-offs. Procore’s user guide lists Scheduling actions as web-only (though its 2026 iOS release notes mention quick percent-complete edits on mobile), its import options cover Primavera P6 and Microsoft Project files rather than Excel, and pricing is based on annual construction volume. For more options in this category, see the best Procore alternatives.
Best for: General contractors whose main need is managing RFIs, submittals and drawings in one platform with the schedule.
Key features
- RFIs, submittals and drawing management
- Procore Scheduling with dependencies, critical path and lookaheads
- Budgets, quality and safety tools
- iOS and Android apps for field teams
Pros
- Dedicated construction document tools instead of templates
- No charge for adding users
- Widely used by general contractors and owners
Cons
- Procore’s user guide lists Scheduling actions as web-only, so check what field teams can update on mobile
- No documented Excel import for schedules, so a Smartsheet schedule is rebuilt or brought in through Microsoft Project
- Pricing is based on annual construction volume and can be high for smaller contractors
Pricing: By quote, as an annual fee based on the products you choose and your annual construction volume. No charge for additional users.
3. Fieldwire
Fieldwire, part of Hilti, is the better fit for field teams who work from drawings. Crews view plans, manage tasks and run punch lists from a phone or tablet, and the Business Plus plan adds RFIs, submittals and change orders. Plan viewing is included on every plan, including the free one.
Fieldwire includes task scheduling with a Gantt view and related tasks, but it isn’t a CPM scheduler. Fieldwire’s own scheduling guide says changing a task’s dates doesn’t automatically move related tasks, and its content describes it as a complement to the master schedule. Teams that use Smartsheet for both schedules and field tracking often pair Fieldwire with a scheduling tool.
Best for: Superintendents and field teams who work from drawings and need tasks, punch lists and plan viewing on phones and tablets.
Key features
- Plan viewing on all plans, with sheet compare on Pro and above
- Tasks and punch lists tied to drawings
- RFIs, submittals and change orders (Business Plus)
- Custom forms (Business and above)
- Gantt view with related tasks and a manpower graph
Pros
- Built for field work from drawings
- Free plan for small teams
- Same project in the browser and on mobile
Cons
- Not a CPM scheduler, so you still need a separate tool for the master schedule
- RFIs and submittals need the Business Plus plan
- The free plan is limited to 5 users, 3 projects and 100 sheets
Pricing: Basic free (5 users, 3 projects); Pro $39, Business $64 and Business Plus $89 per user per month, billed annually.
4. Contractor Foreman
Contractor Foreman is an all-in-one construction management tool for residential and commercial contractors, priced per company rather than per user. It covers estimating, scheduling, crew scheduling, bid management, change orders, submittals and time tracking, depending on the plan.
Its scheduling goes further than many tools in its price range, with all four dependency types, lag, baselines and task links across projects, and its product page lists critical path tracking. The trade-off is that the Gantt scheduler starts on the Plus plan and submittals on Pro, and Contractor Foreman supports Firefox, Brave and Chrome but doesn’t recommend Safari.
Best for: Budget-conscious contractors who want scheduling, crew scheduling and basic construction workflows in one tool at a published price.
Key features
- Gantt scheduling with all four dependency types, lag and baselines (Plus and above)
- Crew schedule and task links across projects
- Change orders and bid management (Plus and above); submittals (Pro and above)
- Estimates on all plans
- iPhone, iPad and Android apps; QuickBooks Online (Plus and above)
Pros
- Flat company pricing within each plan’s user limit
- Scheduling depth close to dedicated scheduling tools
- 30-day free trial
Cons
- The Basic plan has no Gantt scheduling
- Critical path is listed on its product page but not described in its help center
- Users are capped by plan, so growing teams move up tiers
Pricing: Basic $49/month (1 user), Standard $105/month (up to 3 users), Plus $166/month (up to 8 users), Pro $221/month (up to 15 users) and Unlimited $332/month, all billed annually. 30-day free trial.
5. Microsoft Planner and Project
Microsoft Planner and Project is the option for construction teams that want to stay with Microsoft 365. Planner Plan 1 adds a timeline (Gantt) view with dependencies, and Planner and Project Plan 3 adds the critical path, baselines and the Project desktop client for detailed CPM schedules.
For Smartsheet users, the gaps are importing and field access. Planner has no native Excel import, so moving sheets over means rebuilding the plan or using Power Automate, and Project desktop runs on Windows. Neither includes construction document tools. For more on Microsoft’s tools, see the best Microsoft Project alternatives for construction.
Best for: Construction teams on Microsoft 365 that want schedules in Teams and Outlook, with one vendor and sign-in.
Key features
- Timeline (Gantt) view with dependencies (Plan 1 and above)
- Critical path and baselines (Planner and Project Plan 3)
- Project desktop client included with Plan 3
- Works with Teams, Outlook and other Microsoft 365 apps
Pros
- Basic Planner is included with Microsoft 365
- Project desktop handles detailed CPM scheduling
- Familiar for teams already in Microsoft 365
Cons
- No native Excel import in Planner
- Critical path needs Planner and Project Plan 3, and Project desktop runs on Windows
- No RFI, submittal or drawing tools
Pricing: Basic Planner included with Microsoft 365. Planner Plan 1 $10/user/month and Planner and Project Plan 3 $30/user/month, paid yearly.
6. Primavera P6
Primavera P6 is the alternative for professional schedulers running very large or owner-mandated programs. Oracle’s scheduling software calculates the critical path by total float or longest path, handles tens of thousands of activities and produces the XER files many public owners require. It comes as P6 Professional, a Windows desktop application, and P6 EPPM, which runs in a browser.
P6 is much more than most Smartsheet users need. It has a steep learning curve, usually stays with a trained scheduler and focuses on scheduling rather than construction documents. For a closer look, see the best Primavera P6 alternatives.
Best for: Professional schedulers on very large programs, and contractors whose owners require P6 or XER submittals.
Key features
- CPM scheduling with critical path by total float or longest path
- Detailed resource loading and enterprise project structures
- Import of Microsoft Project XML and MPX files
- P6 mobile apps for updating assigned activities and entering time
Pros
- The standard for large construction, infrastructure and energy schedules
- Produces XER files for owners who require them
- Handles schedules far larger than most tools can
Cons
- Steep learning curve, usually needing formal training
- No construction document tools
- Oracle doesn’t publish current prices
Pricing: By quote through Oracle or a reseller.
How to Move a Smartsheet Construction Schedule Into ProjectManager
To move a Smartsheet construction schedule into ProjectManager, export the sheet to Excel, set up a project with matching working days, import the file and re-link the dependencies. Smartsheet’s Excel export brings over the task list but not the Gantt chart, and formulas, attachments and grouping don’t carry over, so plan to check the logic after importing.
- Export from Smartsheet. Open the schedule sheet and export it to Microsoft Excel. Download any attachments separately, since they’re excluded from exports. For a sheet with a Gantt chart, you can also export it as Microsoft Project XML, which ProjectManager imports too.
- Set working days first. In ProjectManager, click the + button and choose Project, then set your working days to match your job, such as a five-day or six-day work week. Working days are hard to change once the project exists. Add any global holidays now too, since they can’t be added to existing projects.
- Import the file. Choose Import File when creating the project, or click the import icon on the Gantt ribbon of an existing project. Click select file, upload your Excel or XML file and click next. If you’re importing into an existing project, choose Keep and append with the imported data or Replace with the imported data. Replace removes everything already in the project.
- Map the columns. For Excel files, map each column, such as task name, assignee, start, finish and duration, to the matching Gantt column, then click import. Columns you leave unmapped are skipped. For XML files, choose task list only or all data.
- Re-link dependencies and add lag. Compare the schedule with your Smartsheet sheet and link any tasks that didn’t come through. Add lag for concrete cure times, inspection holds and material lead times.
- Filter for the critical path. Turn on the critical path filter and check that it shows the tasks that drive the finish date.
- Set a baseline. Once the schedule is right, set a baseline in Gantt settings so you can track variance from the start of the job.
Smartsheet formulas, automations and conditional formatting don’t move into ProjectManager. Rebuild any automated steps with ProjectManager’s own workflows if you need them.
Want to see your schedule in ProjectManager? Start a free 30-day trial, import an exported sheet and turn on the critical path filter. Get started with ProjectManager today for free.
Smartsheet Alternatives for Construction FAQ
Is Smartsheet good for construction scheduling?
Smartsheet works well for straightforward construction schedules. It supports all four dependency types with lag, highlights the critical path and offers baselines on the Business plan and above. It’s less suited to teams that need crew visibility across jobs without an add-on, a Gantt chart on mobile or dedicated construction document tools.
Does Smartsheet have critical path?
Yes. Smartsheet highlights the critical path on its Gantt chart on the Pro, Business and Enterprise plans, based on the dependencies in the sheet. It has less scheduling depth than dedicated CPM tools such as Primavera P6.
What do general contractors use instead of Smartsheet?
General contractors who mainly need scheduling and crew visibility often move to ProjectManager, while those whose main need is RFIs, submittals and drawings tend to choose Procore. Field teams working from plans use Fieldwire, and contractors on very large or owner-mandated programs use Primavera P6.
Can I export a Smartsheet schedule to another tool?
Yes. Smartsheet exports sheets to Excel, Google Sheets and PDF, and sheets with a Gantt chart can also be exported as Microsoft Project XML. Formulas aren’t preserved in Excel exports, attachments are excluded and the Gantt chart itself doesn’t carry into Excel, so you’ll rebuild some logic in the new tool.
Does Smartsheet work offline on a job site?
Only forms. Smartsheet mobile forms can be used offline and submit when you reconnect, but other items in the app need an internet connection. On mobile, the Gantt view is available for reports only.
Related Content
- 6 Best Smartsheet Alternatives (2026)
- Smartsheet for General Contractors: Key Features, Pros & Cons
- Best Microsoft Project Alternatives for Construction (2026)
- 5 Best Primavera P6 Alternatives for Construction Projects (2026)
- 15 Best Construction Scheduling Software for 2026 (Free & Paid)
- 11 Best Procore Alternatives of 2026 (Free + Paid)
- Best Buildertrend Alternatives for Home Builders (2026)
- Best Buildertrend Alternatives for Scheduling with Gantt Charts (2026)
- Best monday.com Alternatives for Construction (2026)